Stan Zaslavsky

In this episode on modular wiring, we wanted to concentrate the conversation on the technologies used during construction such as temporary lighting.

Chris from MyModular talks about the following key insights:

  • How the ELV (Extra Low Voltage) system is utilised to provide safe lighting across the construction site?
  • How do they achieve minimal waste through pre-fabrication of all electrical wiring
  • Self-testing and backup systems for all lights
  • How the temporary lighting is transferred level to level

and much more.

Learn more about MyModular at https://www.mymodular.com/

           
Continue reading next